Small excavator construction must pay attention to what matters _ small excavator how much money, komatsu excavator all models

Update time : 2022-04-02 09:36:57

Micro excavator dumping is digging friends in the daily work of the most basic professional skills, but not everyone can grasp very skilled, it must be a lot of posture continuity smooth practical operation, Therefore, the operators must not only be skilled in training, but also need to know how to use the method of throwing. Today, xiaobian will talk to you about the tips of the micro-excavator throwing. Earth

small excavator construction must pay attention to what matters

yugong machinery equipment small excavator practical operation, smooth characteristics, high cost performance. It is a strong manufacturer, mainly engaged in the production of small excavator manufacturing, manufacturing, product development and marketing. It is specialized in the production and manufacture of small excavators, small excavators, small excavators and small excavators. 1. The operation and moving address of small excavator should be firm and hard. Soft floors should be paved with wooden pillows or cushions. In swampy areas, roadbed works should be carried out first, or the strange caterpillar board in wetland park should be removed. Before using the small excavator, it is necessary to maintain good legs and always maintain the level part. The legs should be placed in the direction of the table, and the rotating shaft should be put behind the table. The small excavator equipped with hydraulic press suspension should lock the hydraulic system of two suspensions. The automatic wheel of the crawler excavator should be placed behind the counter of the cabinet in the matter. The large digging height-width ratio and deep depth of small and medium-sized excavators can not exceed the efficacy of equipment itself. In the traction belt or backhoe, crawler and crawler small excavator things the central spacing of the mesa edge should span 1RN, tire and tire excavator surface central spacing should span 1.5m. When excavating rock with a small excavator, engineering blasting should be carried out first. When excavating frozen soil, icebreaking hammer or engineering blasting should be used to destroy frozen soil. Do not use a bucket to damage the stones and permafrost, otherwise the stones and permafrost will be hard gnawed with a single crawler board. Digging at the edge of the pit, when the danger of collapse is perceived, the small excavator should immediately solve the risk or remove the small excavator buffer zone. No umbrella-like edges and loose boulders should be left at the pit limits. In the leveling of agricultural excavator things in place, can not be used to carry out finishing shovel or shovel ramming road.