The basic operation process and safety knowledge of small excavator price, small excavator _ micro excavator digging mountain road

Update time : 2022-04-02 09:19:33

small excavator manufacturers of various parts of small excavators

small excavator manufacturers of various parts of small excavators a walking, walking equipment equipment namely automobile chassis, contains the crawler walking frame and system software, the key of crawler frame, torque converter + reducer and pipeline, driving wheel, guide wheel, chain sprocket, Support wheel, crawler, tightening cache equipment, its role is to support the net weight of the small excavator, and the driving force of the driving wheel transmission conversion

micro excavator mountain road basically operating process and safety knowledge

process 1: Before the excavation of the foundation pit, dig out all the tree technology that is in the way of the miniature excavator, in order to prevent damage to the pipeline and lamp on the arm of the miniature excavator, such consumables!

process 2: From the side of the mountain type first to the surface of the bush and miscellaneous trees such as the outer skin dug underneath!

process 3: after lifting the skin, the first shovel extends the bucket to the front, and gradually digs from the side. At the same time, the high and low curves of the road are set! One by one to the excavation of the foundation pit is at least 50 cm wide than the total width of the mini excavator, and the mini excavator's parking position should be at least 50 cm in the side of the road to convenient dumping soil is not easy to rub the hip!

process 4: dig to similar width, the inside side of the edge with the edge teeth cut clean, then remember to fill the final several bucket of soil on both sides of the empty earth when the bucket is pressed down the next arm to tamp the two sides of the empty earth and slightly float high crawler will be pressed, (so it will prevent the mini excavator overturned) process 5: Encounter stones do not have to do, the state of mind is better, to use qiajin, take a fancy to the texture of stones towards the use of edge tooth buckle gap, remember the crawler pad in solid digging, posture as far as possible to meek! Otherwise the lower arm is too fast will cause the micro excavator to move! (one side of the cliff is very dangerous)

process 6: repair the initial blank, only the performance of micro-excavation too!

process 7: after the initial blank line is open to traffic back to the need for product fine repair, with the scoop is the central pile of soil crazy sweep to the outside side of the track imprint, the turn must be widened to dig wide, some buried valuable flowers and trees hook out! Remove the debris from the inside that may collapse!

Yu Gong machinery xiaobian reminds everyone that we must pay attention to safety in operation.